9/10/2023 0 Comments Cheap oil changes in goletaOf the 55 existing trees, 38 trees are proposed for removal, one is proposed to be relocated, and 16 will be protected in place. The anticipated grading includes 3,700 cubic yards of cut, 280 cubic yards of fill, and 3,420 cubic yards of export. The applicant is requesting a parking space reduction from 79 required spaces to 65 spaces. The DRB Agenda and staff report will be available on or before June 8th at The property owner is considering demolishing and replacing all existing buildings (10 buildings and 1 barn) except the existing education building (renovation only) and relocating the historic Beck House on-site with the removal of the non-historic addition. to get feedback on building design and site changes. The Design Review Board (DRB) will conduct a Conceptual Design Review of the proposed project on Tuesday, June 13, 2023, at 3:00 p.m. Santa Barbara (SB) Humane, located at 5399 Overpass Road in Goleta, is requesting potential changes to its facilities on the 3.98-acre site. Standard Details, Documents and DownloadsÄesign Review Board to Consider Proposed Changes to Santa Barbara Humane Campus on June 13.Pavement Rehabilitation and Concrete Repair Program.Hollister Avenue Complete Streets Corridor Project.9007 - San Jose Creek Bike Path - Middle Extent 9006 - San Jose Creek Bike Path - Northern and Southern Segments 9002 - Ekwill Street & Fowler Road Extensions Hollister Avenue Old Town Interim Striping Project.Building Electrification and Reach Codes.Planning Commission Contact Information.Previous Zoning Regulations- Coastal Zone. General Plan/Coastal Land Use Plan Final EIR.Shelby General Plan Amendment and Shelby Residential Project.Marriott Residence Inn and Hollister Center Project REVISED FINAL EIR Part 2.Marriott Residence Inn and Hollister Center Project REVISED FINAL EIR Part 1.Kellogg Crossing (Formerly Schwan) Self-Storage Development Plan Amendment.Hollister Village 27 Apartment Project (2019).Hollipat Permanent Parking Lot Development Plan Amendment.Fuel Depot Gas Station and Convenience Store.Cox Communications Headquarters Upgrade.Chabad of Santa Barbara - New Synagogue Buildings and Site Improvements.130 and 132 Robin Hill Road Site Improvements.Santa Barbara Airport Land Use Compatibility Plan.Annual Financial Statements of the Redevelopment Agency.Dissolved (Former) Redevelopment Agency +.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |